Projects
Turbomachine
Installation, Commissioning, Start Up
• West ethylene Pipeline NPC/PIDMCO / OTC
23 Unit Siemens Electro compressors
• Shiraz 3rd ammonia – Urea Petrochemical
- 3 unit steam turbine Siemens compressors
- 1 unit Man Turbo co2 compressor
- Reformer package 1 unit including ID & FD fan For turbine drive
- 5 unit Shinkawa pumps
- 5 unit steam & Electric BFW pumps (KSB)
- 2 unit crushers of Urea – ammonia plan
- 1 unit N2 Booster compressor
- South Pars Gas Field Phase 12
- 2 unit Off Gas Siemens Electro compressors
- South Pars Gas Field phase 17 & 18 Assaluyeh
- 4 Unit Cryostar Turbo expanders PLS S7, WINCC
South Pars Gas Field phase 15 & 16 Assaluyeh Iran:
- 2 unit Atlascopco Turbo expander AMB systems (S2M)
Bandar abbas Refinery Gasoline production increase Projects
- 2 unit steam turbine & centrifugal compressors
Maroon Petrochemical
- 1 Unit Solar Gas Turbine train Installations, Pre – commissioning and start up one unit
South Pars Gas Field phase 3 & 4 Assaluyeh Iran:
- 1 unit Atlascopco Turbo expander AMB system (S2M)
Lorestan Petrochemical
- 1 unit Ethylene Siemens Electro compressor
Abadan Refinery Project
- 1 unit HTC steam turbine & SBW centrifugal compressor
Bandar Imam Petrochemical, NF3 Plant
- 3 unit Man Turbo compressors
List of projects which have been commissioned compressors behind of Siemens commissioning group.
- Kharg Methanol project (1998-2000), 2 unit steam turbine compressor.
- BIPC MTBE project (2001-2002), 1 unit steam turbine compressor.
- NGL1200 project (2003), 7 unit electro-compressor.
- Amirkabir Olefin project (2005), 3 unit steam turbine compressor.
- Zagros Methanol project (2005), 1 unit steam turbine compressor.
- Razi 3th Ammonia project (2006), 2 unit steam turbine compressor.
- Morvarid Olefin project (2008), 3 unit steam turbine compressor.
Boiler / HRSG
- Basreh, Iraq: water tube Boiler 132 ton / hr. Qty 2, Basreh petrochemical
- Kermanshah: water tube Boiler 75 ton / hr. Qty =1
- Kordestan: water tube Boiler 40 ton / hr. Qty =2 kordestan petrochemical
- Khangiran: water tube Boiler 110 ton / hr. Qty =1 Khangiran gas treatment plant
- Jondishapour + LOOC: water tube Boiler 35 ton / hr. Qty =4