Projects

Biston Lab

Phase17-18

Shiraz-BFW

Shiraz-Manturbo

Shiraz-Reformer

Shiraz-Siemens

Control System

Turbomachine

Installation, Commissioning, Start Up
•    West ethylene Pipeline NPC/PIDMCO / OTC
 23 Unit Siemens Electro compressors
•    Shiraz 3rd ammonia – Urea Petrochemical

  • 3 unit steam turbine Siemens compressors
  • 1 unit Man Turbo co2 compressor
  • Reformer package 1 unit including ID & FD fan For turbine drive
  • 5 unit Shinkawa pumps
  • 5 unit steam & Electric BFW pumps (KSB)
  • 2 unit crushers of Urea – ammonia plan
  • 1 unit N2  Booster compressor
  • South Pars Gas Field Phase 12
  • 2 unit Off Gas Siemens Electro compressors
  • South Pars Gas Field phase 17 & 18 Assaluyeh
  • 4 Unit Cryostar Turbo expanders PLS S7, WINCC


South Pars Gas Field phase 15 & 16 Assaluyeh Iran:

  •  2 unit Atlascopco Turbo expander AMB systems (S2M)

Bandar abbas Refinery Gasoline production increase Projects

  •  2 unit steam turbine & centrifugal compressors

 Maroon Petrochemical

  • 1 Unit Solar Gas Turbine train Installations, Pre – commissioning and start up one unit

South Pars Gas Field phase 3 & 4 Assaluyeh Iran:

  • 1 unit Atlascopco Turbo expander AMB system (S2M)

Lorestan Petrochemical

  • 1 unit Ethylene Siemens Electro compressor

Abadan Refinery Project

  •  1 unit HTC steam turbine & SBW centrifugal compressor

Bandar Imam Petrochemical, NF3 Plant

  •  3 unit Man Turbo compressors

List of projects which have been commissioned compressors behind of Siemens commissioning group.

  • Kharg Methanol project (1998-2000), 2 unit steam turbine compressor.
  • BIPC MTBE project (2001-2002), 1 unit steam turbine compressor.
  • NGL1200 project (2003), 7 unit electro-compressor.
  • Amirkabir Olefin project (2005), 3 unit steam turbine compressor.
  • Zagros Methanol project (2005), 1 unit steam turbine compressor.
  • Razi 3th Ammonia project (2006), 2 unit steam turbine compressor.
  • Morvarid Olefin project (2008), 3 unit steam turbine compressor.

Boiler / HRSG

  • Basreh, Iraq:  water tube Boiler 132 ton / hr. Qty 2, Basreh petrochemical
  • Kermanshah:  water tube Boiler 75 ton / hr. Qty =1
  • Kordestan:  water tube Boiler 40 ton / hr. Qty =2 kordestan petrochemical
  • Khangiran:  water tube Boiler 110 ton / hr. Qty =1 Khangiran gas treatment plant
  • Jondishapour + LOOC: water tube Boiler 35 ton / hr. Qty =4